AGT4 Aylesbury south of A41 (including Hampden Fields)

AGT4 Aylesbury south of A41 (including Hampden Fields)

  • Around 3,310 new homes (building work started on a small part of the site comprising 135 dwellings, whole site completion estimated in 2033)
  • Around 6.9ha of employment land
  • New road infrastructure inc a dualled Southern Link Road between A413 Wendover Road and A41 Aston Clinton Road and a strategic link road between the Southern Link Road and Marroway
  • Two new primary schools
  • New local centre with retail opportunities
  • 60-bed care home/extra care facility
  • Land for a park & ride site
  • 50% of the site to be multi-functional green infrastructure totalling 108ha (including public open spaces and children’s play areas and sustainable drainage)
  • Strategic flood defences and surface water attenuation
  • Cycling and walking links