AGT4 Aylesbury south of A41 (including Hampden Fields)
- Around 3,000 new homes (building work started on a small part of the site comprising 135 dwellings, whole site completion estimated in 2033)
- Around 6.9ha of employment land
- New road infrastructure inc a dualled Southern Link Road between A413 Wendover Road and A41 Aston Clinton Road and a strategic link road between the Southern Link Road and Marroway
- Two new primary schools
- New local centre with retail opportunities
- 60-bed care home/extra care facility
- Land for a park & ride site
- 50% of the site to be multi-functional green infrastructure totalling 108ha (including public open spaces and children’s play areas and sustainable drainage)
- Strategic flood defences and surface water attenuation
- Cycling and walking links